Description
-
ModelRED615
-
Product NameLine Differential Protection and Control IED
-
Place of OriginFinland
-
HS Code85372090
-
Dimensions164 mm (width) × 160 mm (height) × 201 mm (depth)
-
Weight3.5 kg
-
Operating Temperature-25 °C ~ +55 °C
-
Storage Temperature-40 °C ~ +70 °C
-
Part NumberHBDCACADABB1AAN1XC
-
Warranty12 month
-
Product StatusNew and original
-
BrandABB
Backed by abundant in-stock inventory and nearly 20 years of industry experience, our company stands as a leading player in the industrial control sector.We offer an extensive range of industrial control products covering numerous models. Should you have any other requirements, please feel free to contact us, and we will respond to you promptly.
Our main brand:
1.ABB's module cards, touch screens, controllers, etc., such as PP846 touch screen, IGCT starting with 5SHY, PM starting controller, AI, DO starting input/output module, SP starting Bailey module, etc
2.GE's module card CPUs, such as VMIC starter, IS200, IS215, IS400, IS420 series, etc,
3.Emerson's card components and EPRO probes, Westinghouse 1C series, Honeywell CC series, Schneider 140 series, Envision full series, Bentley 3500 series, Rexroth motors and drives, and Foxboro small modules.
Auxiliary Power Supply Input
Operating voltage range: 48–250 V DC and 100–240 V AC
Power consumption: ≤12 W nominal, maximum 18 W for DC supply; ≤16 W nominal, maximum 21 W for AC supply
Maximum permissible DC voltage ripple: 15% at 100 Hz
Analog Measurement Inputs
Phase current inputs: Nominal 1 A or 5 A, configurable via software
Thermal withstand: Continuous 20 A; 500 A for 1 second
Residual current input: Selectable 1 A/5 A or 0.2 A/1 A
Residual voltage input rated values: 100 V, 110 V, 115 V, 120 V AC
Supported nominal frequency: 50 Hz / 60 Hz
Binary Inputs (BI)
Total quantity: 11 binary status inputs
Pick-up threshold: Adjustable within 18 V DC to 176 V DC through IED settings
Binary inputs do not provide internal excitation; external control voltage must be provided.
Binary Output Contacts
Power Outputs (PO, heavy-duty trip contacts)
2 × Normally Open PO contacts
2 × Double-pole PO contacts equipped with trip circuit supervision
Contact capacity: Continuous carry 5 A; 10 A for 3 seconds; 15 A for 0.5 seconds
Breaking rating applicable up to 250 V AC / DC
Signal Outputs (SO)
4 × SPDT changeover signal contacts
1 × Normally Open signal contact
IRF Internal Fault Output
Independent Normally Open dry contact for IED hardware failure indication
General contact characteristic: All outputs are passive dry contacts without internal power supply.
Minimum required contact load: 10 mA at 5 V AC/DC
Communication Interfaces
Equipped with electrical/optical Ethernet and serial communication ports. Communication circuits obtain power internally without separate external field power.
Supplementary Remarks
CT secondary rated current, VT rated voltage and binary input activation thresholds are configured using PCM600 software. All inputs and outputs can be flexibly assigned to protection, control, alarm and interlock functions via the internal signal matrix.

1. Unpacking & Pre-installation Inspection
Carefully remove packaging and inspect the IED for transportation damage, scratches or deformed connectors.
Verify model code HBDCACADABB1AAN1XC, serial number and delivery accessories against delivery documents.
Check installation environment: temperature -25°C ~ +70°C, humidity 5%–95% non-condensing; avoid severe vibration, dust, corrosive gas and strong electromagnetic interference.
Prepare necessary tools: ESD wrist strap, torque screwdriver, multimeter and installation accessories.
2. Cabinet Cutout Confirmation & Mechanical Mounting
Adopt flush / semi-flush panel mounting according to design requirements.
Confirm panel cutout dimension: 165.5 mm × 161.5 mm; guarantee sufficient rear wiring space.
Detach the plug-in main unit first: lift front handle to 90° to unlock, then pull the plug-in unit out from the housing case.
Secure empty housing case onto cabinet panel with specified torque (0.7–1.0 N·m). Ensure uniform gasket compression to maintain front IP protection rating.
Keep minimum clearance around the IED for natural heat dissipation.
3. Insertion & Locking of Plug-in Unit
Align plug-in unit with housing guide rails; lift handle to 90° and push the unit fully inward.
Swing the handle down gradually to complete internal connector engagement. Confirm the unit is fully seated without gap.
Install sealing wire on front handle sealing screw to prevent unauthorized removal.
Do not apply brute force during insertion to avoid damaging internal back connectors.
4. Protective Earth Connection
Run dedicated PE ground wire to the IED protective earth terminal.
Connect the other end reliably to cabinet main earth bar.
Implement single-point grounding; avoid forming ground loops together with CT/VT cable shielding.
5. Field Wiring Work (Power OFF Status Mandatory)
Auxiliary Power Wiring
Connect AC/DC auxiliary supply to power terminals. Confirm voltage range: 48–250 V DC / 100–240 V AC. Strictly check polarity for DC supply.
CT & VT Analog Input Wiring
Wire current transformer and voltage transformer secondary circuits. Follow polarity requirements strictly for differential protection.
Use twisted shielded cables; cable shield grounded at cabinet terminal side only.
Never open CT secondary circuit during operation.
Binary Input Wiring
Connect external status signals to binary input terminals. Binary inputs require external excitation voltage.
Binary Output Contact Wiring
Wire trip PO contacts, signal SO contacts and IRF fault output. All contacts are passive dry contacts.
Separate trip circuit wiring from low-signal cables to reduce interference.
Communication Wiring
Install Ethernet cables or fiber optic cables for IEC 61850 / differential line pilot communication. Respect minimum bending radius for optical fibers.
Route power cables, analog cables and signal cables in separate cable ducts.
6. Wiring Continuity & Insulation Check
Check all terminals are fastened with standard torque to avoid loose contacts.
Perform continuity test for each circuit; confirm no short-circuit between phases, short to ground or crossed wiring.
Verify insulation resistance of secondary circuits meets site safety requirements.
Label each wire terminal clearly according to wiring drawing.
7. Pre-power-on Verification
Double-check wiring polarity, CT/VT wiring sequence, auxiliary power range.
Confirm no temporary test jumpers remain on terminals.
Clear foreign debris inside housing and terminal area.
8. Power-on Initial Check
Energize auxiliary power supply.
Observe front panel LED indicators; wait for IED self-diagnosis initialization.
Confirm no hardware fault alarm appears after startup.
Connect laptop via front service port using PCM600 software to verify communication with the IED.
9. Post-installation Arrangement
Arrange and bind all cables neatly. Install cable gland sealing.
Close cabinet door; record installation information including installation position, wiring inspection result and installation date.
Retain wiring photos for future maintenance.

Frequently Asked Questions (FAQ)
1.How fast will you reply to my inquiry?
We process all inquiries efficiently and will respond promptly once we receive your message.
2.Do you carry large inventory of industrial control parts?
We maintain massive ready stock of mainstream automation spare parts to shorten lead times.
3.Can you source discontinued or obsolete PLC & DCS modules?
Absolutely.
We specialize in sourcing hard-to-find, obsolete and out-of-production industrial control components.
4.Do you inspect goods before shipment?
Every product undergoes thorough inspection before packing and dispatch.
5.Can you ship orders worldwide?
We provide global shipping with flexible logistics for urgent and regular orders.
6.What payment methods are available?
We accept multiple secure payment options. Please contact our sales team for detailed terms